Development of Fire and Explosion Risk Assessment on Coal Reclaim Tunnel Using Monte Carlo Simulation and Risk Matrix Method
  • +1
  • Nuhindro Priagung Widodo,
  • Dimas Agung Permadi,
  • Ahmad Ihsan,
  • Ginting Jalu Kusuma
Nuhindro Priagung Widodo
Institut Teknologi Bandung

Corresponding Author:[email protected]

Author Profile
Dimas Agung Permadi
Institut Teknologi Bandung
Author Profile
Ahmad Ihsan
Institut Teknologi Bandung
Author Profile
Ginting Jalu Kusuma
Institut Teknologi Bandung
Author Profile

Abstract

The comprehensive fire and explosion risk assessment has been studied for Coal Reclaim Tunnel (CRT) facility by applying the Monte Carlo simulation method. In this research, the fire and explosion risk of two existing CRT, namely model A and model B, have been assessed. A set of 30 data for each factor has been used to define the statistical distribution model, sourced from historical data, field measurement, and laboratory experiments. Based on the simulation, CRT model A has a 100% extreme risk group, while model B has two risk groups, high risk=81.73% and moderate risk=18.27%, classified as a not acceptable risk. Several preventive actions were set to reduce the probability and severity level as low as reasonably possible, especially for the controllable factors. Furthermore, the probability and severity levels were re-adjusted by the Monte Carlo simulation. The result shows that both the CRT model have been grouped into a 100% moderate-risk group. For optimal prevention against explosion risk, a sensitivity analysis has been carried out to find the most influential factors for the fire and explosion risk in CRT. Through this research, a method for risk matrix assessment related to the fire and explosion in the CRT facility has been developed.
18 Jun 2021Submitted to Engineering Reports
20 Jun 2021Submission Checks Completed
20 Jun 2021Assigned to Editor
07 Jul 2021Reviewer(s) Assigned
07 Aug 2021Editorial Decision: Revise Major
05 Oct 20211st Revision Received
06 Oct 2021Submission Checks Completed
06 Oct 2021Assigned to Editor
06 Oct 2021Reviewer(s) Assigned
26 Oct 2021Editorial Decision: Accept