loading page

A genomic-based workflow for eDNA assay development for a critically endangered turtle, Myuchelys georgesi
  • +4
  • Holly Nelson,
  • Arthur Georges,
  • Katherine Farquharson,
  • Elspeth McLennan,
  • Jane DeGabriel,
  • Katherine Belov,
  • Carolyn Hogg
Holly Nelson
The University of Sydney
Author Profile
Arthur Georges
University of Canberra
Author Profile
Katherine Farquharson
The University of Sydney
Author Profile
Elspeth McLennan
The University of Sydney
Author Profile
Jane DeGabriel
NSW Department of Climate Change, the Environment, Energy and Water
Author Profile
Katherine Belov
The University of Sydney
Author Profile
Carolyn Hogg
The University of Sydney

Corresponding Author:[email protected]

Author Profile

Abstract

Environmental DNA (eDNA) analysis has become a popular conservation tool for detecting rare and elusive species. eDNA assays typically target mitochondrial DNA (mtDNA) due to its high copy number per cell and its ability to persist in the environment longer than nuclear DNA. Consequently, the development of eDNA assays has relied on mitochondrial reference sequences available in online databases, or in cases where such data are unavailable, de novo DNA extraction and sequencing of mtDNA. In this study, we designed eDNA primers for the critically endangered Bellinger River turtle (Myuchelys georgesi) using a bioinformatically assembled mitochondrial genome (mitogenome) derived from a reference genome. We confirmed the accuracy of this assembled mitogenome by comparing it to a Sanger-sequenced mitogenome of the same species, and no base pair mismatches were detected. Using the bioinformatically extracted mitogenome, we designed two 20 bp primers that target a 152-base-pair-long fragment of the cytochrome oxidase 1 (CO1) gene and a 186-base-pair-long fragment of the cytochrome B (CytB) gene. Both primers were successfully validated in silico, in vitro, and in situ.
24 Nov 2024Submitted to Ecology and Evolution
25 Nov 2024Submission Checks Completed
25 Nov 2024Assigned to Editor
25 Nov 2024Review(s) Completed, Editorial Evaluation Pending
26 Nov 2024Editorial Decision: Revise Minor
05 Dec 20241st Revision Received
06 Dec 2024Submission Checks Completed
06 Dec 2024Assigned to Editor
06 Dec 2024Review(s) Completed, Editorial Evaluation Pending
10 Dec 2024Editorial Decision: Accept