Abstract

Based on the improved analytic hierarchy process (IAHP) and TOPSIS method to build the construction project safety evaluation index system used to evaluate the safety management of construction projects in the construction stage, so as to control the safety risk of the project, prevent the occurrence of safety accidents, and improve the level of safety management. Through make a statistical analysis of the recent safety accidents in construction projects in China, comprehensively consider the four aspects of human, object, environment and management, establish 12 evaluation indexes of construction project safety management. Through improved analytic hierarchy process (AHP) to determine evaluation index weights vector, combined with the ideal solutions for sorting method, put forward a IAHP method and TOPSIS method based on the safety evaluation model.The research results show that the model can accurately show the deficiencies of the safety management of the evaluation object, and directly reflect the safety management level of the evaluation object. The research conclusion is consistent with the actual situation of the project, which can provide guidance for the improvement of safety redundancy and safety risk control of construction engineering.
11 Jan 2021Submitted to Engineering Reports
11 Jan 2021Submission Checks Completed
11 Jan 2021Assigned to Editor
08 Feb 2021Reviewer(s) Assigned
14 Aug 20211st Revision Received
16 Aug 2021Submission Checks Completed
16 Aug 2021Assigned to Editor
16 Aug 2021Reviewer(s) Assigned
03 Sep 2021Editorial Decision: Revise Major
06 Oct 20212nd Revision Received
07 Oct 2021Submission Checks Completed
07 Oct 2021Assigned to Editor
08 Oct 2021Reviewer(s) Assigned
10 Oct 2021Editorial Decision: Revise Minor
18 Oct 20213rd Revision Received
18 Oct 2021Submission Checks Completed
18 Oct 2021Assigned to Editor
19 Oct 2021Editorial Decision: Accept